Bridge Contract Assignment in Sheffield

This fall the Bayside Team contributed in the MassDot field scoping meeting of the bridge to determine the direction of the reconstruction of the structure.
This fall the Bayside Team contributed in the MassDot field scoping meeting of the bridge to determine the direction of the reconstruction of the structure.

Bayside Engineering announces a bridge contract assignment in Sheffield, Massachusetts. The project consists of preparing plans and estimates for a proposed bridge replacement on Berkshire School Road over Schenob River.

This assignment includes up to the 25% design stage including preliminary bridge design plans, highway design documents and Preliminary Right-of-Way plans.

Bayside’s design team has successfully completed over three hundred Massachusetts bridge and highway projects.

Whatever the project, Bayside offers the qualifications, experience, professional staff and the in-house resources needed to solve almost any individual bridge problem.