Bayside Engineering announces a bridge contract assignment in Sheffield, Massachusetts. The project consists of preparing plans and estimates for a proposed bridge replacement on Berkshire School Road over Schenob River.
This assignment includes up to the 25% design stage including preliminary bridge design plans, highway design documents and Preliminary Right-of-Way plans.
Bayside’s design team has successfully completed over three hundred Massachusetts bridge and highway projects.
Whatever the project, Bayside offers the qualifications, experience, professional staff and the in-house resources needed to solve almost any individual bridge problem.