Design difficulties included fixing an existing substandard and hazardous rapid alignment change at the movable draw span portion of the existing bridge. The project is located in a heavily developed section of South Boston; therefore, the existing roadway approaches alignments as well as the abutments had to be retained. In addition, the United States Coast Guard regulated waterway vertical clearance through the old draw span portion of the structure had to be increased for the replacement fixed span structure. Bayside Engineering's innovative design included a super elevated curve
which smoothes out the roadway alignment over the Reserved Channel, the
new bridge structure maintains speed of the Summer Street approaches and
the increased vertical clearance serves the needs of boaters and fishermen
in the area Refer to Projects for additional designs completed by Bayside Engineering, Inc.