Traffic Design

news-mediaReconstruction of Route 97 (Topsfield Road) At Maple Street/Cherry Street Wenham, Massachusetts

Bayside Engineering’s services on this project began at the planning phase, continued to the design development stage and concluded with Final Acceptance of the project after providing construction administration and conducting a successful field inspection. The project objectives were to improve safety and efficiency for both pedestrian and vehicular travelers at this high accident intersection in the Town of Wenham. Read more.

 

Avon Bodwell Street Reconstruction & Traffic Signals

avon-bodwell01PWED Roadway Rehabilitation and Traffic Safety Improvements
Bodwell St. And Bodwell St. Extension From Pond St. To Wales Ave. Avon, MA

Bayside Engineering, Inc. (Bayside) was retained by the Town of Avon to assist in obtaining PWED funding and to design and oversee construction of the proposed improvements to Bodwell Street. Bayside was responsible for the design and on site construction supervision for this project. Read more.

Watertown Square Downtown Improvements

watertown-square02Bayside Engineering, Inc. has been working for the City of Watertown since July 1998. The Watertown Square Study Commission was formed to examine the existing conditions and formulate strategies to improve the physical and economic condition of Watertown Square. Read more.

 

 

MassDOT High Hazard Intersections

Over the past 30 years Bayside Engineering’s Traffic Department has maintained various open-end contracts administered by the MassDOT Traffic Section. The contract design objectives are to improve safety and efficiency at critically hazardous locations throughout the Commonwealth. Read more.