Category: Project News

Bridge Street Park Project, Grafton

Bayside provided professional engineering services for the development and preparation of plans, specifications and cost estimates for the recently completed Bridge Street Park Project (Bridge Street over the Quinsigamond River) in Grafton, Massachusetts. The stone arch bridge was taken out of vehicular service several decades ago after Bridge Street was constructed. The rehabilitation included partial […]

Construction Continues on the Gallagher Intermodal Pedestrian Bridge in Lowell

Teaming up with AECOM, Bayside provided the structural design of the truss bridge, bridge pier and footings. Bayside also provided construction oversight services as the Structural Engineer of Record. The 140-foot walkway will provide tenants of the new Thorndike Exchange Development safe access to the transportation terminal. The bridge was fabricated in Maine in two […]

Boxford Accelerated Culvert Follow-Up

Engineers Bree Sullivan and Laura Young spent the morning investigating the status of the “now famous” accelerated culvert replacement in Boxford.  Bayside completed the aggressive project within a 3 day weekend, from removal of the culvert to the final paving, striping and guardrail placement.  The 3 year follow-up shows that culvert is still performing exactly […]

Confined Space Inspection

Bayside recently explored the condition of the Danvers Putnamville Reservoir’s gatehouse and outlet works for the Salem/Beverly Water Supply Board.  Bree Sullivan, our Civil and Environmental Engineer, completed the confined space inspection with Industrial Safety & Rescue at the ready with a two person extraction team.  The 37’ foot deep outlet works gatehouse was constructed […]

Commonwealth Avenue Bridge Replacement Project

Bayside Engineering is pleased to be part of the innovative Commonwealth Avenue Bridge Replacement Project. The project is using Accelerated Bridge Construction techniques (ABC) thereby reducing construction impacts from 4 years to two intensive construction shutdown windows. The key to this project is the ability to build major components off-site and then quickly assemble them […]

Construction Continues on Bayside’s Route 97 Redesign

Construction continues on Route 97 in Groveland, Massachusetts. Bayside’s design improvements include: roadway reconstruction, sidewalk reconstruction, ADA compliant wheelchair ramps, on-roadway drainage improvements, new signage, and pavement markings. Based on the type of project, the methods Bayside’s design specified were able to pass along a cost savings of almost $200,000 to our client. One of the […]

Construction to Begin in Gardner

Bayside’s engineering services were retained by the City of Gardner for the design of two pre-engineered steel buildings, a new 5,600 SF Office Building and a 14,000 SF Cold Storage Building. This included environmental permitting, office layout, structural design, electrical, mechanical and plumbing design and construction administration. The design work also covered the renovation of […]

Construction Complete: Northampton & Southampton Pedestrian Accessibility Improvement Project

Pedestrian accessibility projects have been recently completed on Route 10 in Southampton and Route 9, North King Street in Northampton. Bayside Engineering designed sidewalks, wheelchair ramps and crosswalk warning beacons for both locations. To accommodate pedestrians, necessary improvements included driveway reconstruction, new pavement markings, and crosswalks. All design elements meet current AAB/ADA standards, rules, and […]