Category: Project News

Accelerated Culvert Replacement Town of Boxford: 1 Year Update

In 2014, Bayside Engineering designed an embedded 6′ x 8′ MassDOT/ACOE stream-crossing-compliant culvert replacement on Main Street in Boxford. The culvertĀ replaced a 100 year old 42″ square field stone culvert. TheĀ replacement was completed in 4 consecutive days, including paving. These one year inspection photos reflect the accuracy of the hydraulic model and proper culvert size […]

Bayside Completes Design for Route 97 in Groveland

Bayside has completed the design and bid documents for the Reconstruction of Route 97 in Groveland, Massachusetts. The design improvements include roadway reconstruction, sidewalk reconstruction, ADA compliant wheelchair ramps, on-roadway drainage improvements, new signage, and pavement markings. A major component of the job involved Project Manager, Michael Rizzo, of Bayside providing assistance to the Town […]