Traffic Management & Signalization

  • Traffic Impact and Access Study – Burlington

    Bayside Engineering prepared a Traffic Impact and Access Study for the proposed Mercedes-Benz Dealership in Burlington, Massachusetts.

  • Traffic Impact and Access Study – Norwood

    Bayside Engineering prepared a Traffic Impact and Access Study for the proposed CarMax Auto Superstore retail facility on Providence Highway (Route 1) in the Town of Norwood, Massachusetts.

  • Traffic Impact and Access Study – Littleton

    Bayside Engineering prepared a Traffic Impact and Access Study for the proposed residential development in Littleton, Massachusetts. The development is located on approximately 23 acres of land on the north side of Great Road, east of Grist Mill Road. The site previously was a vacant, wooded parcel of land.

  • Traffic Signal and Intersection Improvements – Andover

    Bayside Engineering’s services on this project began at the planning phase, continued through to the design development stage and concluded with Final Acceptance of the project after providing construction administration and conducting a successful field inspection. The project objectives were to design a traffic signal to improve safety and efficiency for vehicular and pedestrian activity, taking into account the peaking characteristics of the adjacent IRS facility in the Town of Andover.