Construction Complete: Northampton & Southampton Pedestrian Accessibility Improvement Project

Pedestrian accessibility projects have been recently completed on Route 10 in Southampton and Route 9, North King Street in Northampton. Bayside Engineering designed sidewalks, wheelchair ramps and crosswalk warning beacons for both locations. To accommodate pedestrians, necessary improvements included driveway reconstruction, new pavement markings, and crosswalks. All design elements meet current AAB/ADA standards, rules, and […]

Construction nearly complete for the repair of the Mount Washington Street Wall in Everett

Bayside Engineering was hired by the City of Everett to investigate the conditions of the retaining wall on Mount Washington Street and to make recommendations on how to proceed with the correction of the identified deficiencies. The distressed retaining wall is located along the entire eastern side of Mount Washington Street beginning just south of […]

Bayside Engineering Client Awarded $725,000 MassWorks Grant to Repair Town Bridge

In an effort to correct ineffective bridge barriers, deteriorating sidewalks and an aging drainage system, Bayside Engineering was retained by the Town of Shirley to prepare design plans for repairs and improvements to the Main Street Bridge over Catacunemaug Brook. The bridge and roadway design included wall and sidewalk improvements to one side of the […]

Holiday Toy Drive

It’s that time again…happy to be part of National Development/ Unicorn Park‘s Toy Drive with the help of Building Impact. All to benefit the The Home for Little Wanderers and Horizons for Homeless Children. Happy Holidays!

Bridge Inspections In Progress

This fall we’ve been busy out inspecting bridges throughout the state. Pictured is Grafton’s Pleasant Street Bridge over the Blackstone River. Not only did we just inspect it – but we were also responsible for the Award Winning Historic Stone Arch Replacement Design – Build project in 2010. Learn more about the project here: https://www.baysideengineering.com/grafton-historic-arch-cmaa-award-winner/ […]

Designs Completed for Elm Street Project

Bayside Engineering recently completed the design and bid documents for the rehabilitation of Elm Street in Georgetown, Massachusetts. The project involved .8 miles of Elm Street from its intersection with East Main Street and extending to its intersection with Central Street. In a recent Georgetown Record article, Selectman Chair Trapani explained the Elm Street Project […]

Construction in Progress on Rt. 97 in Groveland

Construction is in progress on Route 97 in Groveland, Massachusetts. Bayside’s design improvements include: roadway reconstruction, sidewalk reconstruction, ADA compliant wheelchair ramps, on-roadway drainage improvements, new signage, and pavement markings.  Learn more about the $6 million project.